APPLICATIONS

BUILD

BUILD

Although the sheathing on the roof and facade differs according to the horizontal or vertical overlapping uses, it should be laid taut with a minimum of 10 cm overlap and the overlaps should be taped.

At the beginning and end of the cover application, it should be adhered to the surface with putty or butyl tape. If the product type is not PLUS, tape should be applied between the two covers in cover joints.

The covered area of the rolls is 75 m² and the area to be covered is 70 m² under ideal conditions. When the package is opened, it is necessary to protect the cover surface from dust and water. A clean surface is required for the application of tapes and pastes. The top of the cover should be closed within a maximum of 4 months.

  • It is a part of the system in air gap and heat insulated curtain wall applications.
  • It is a modern under-tile cover on supported and unsupported, ventilated and non-ventilated roofs.
  • Used as a membrane under the shingle.
  • It is applied under coating on clamped metal roofs.